SL. NO. |
NAME OF PARTY |
DATE |
DESCRIPTION |
QTY |
STATUS |
|
1 |
AIREFF DETOX PRIVATE LIMITED, MUMBAI |
28-07-2015 |
WORK ORDER FOR ERECTION OF FABRICATED TECHNOLOGICAL STRUCTURES OF “OVERHEAD TANK FOR SRF & EMERGENCY OVERHEAD TANK” AND FOR COMMON PUMP HOUSE FOR EXTERNAL WATER SYSTEM FOR SMS-III (PKG-077) AT SAIL-BSP BHILAI |
800 MT |
IN PROGRESS |
|
2 |
AIREFF DETOX PRIVATE LIMITED, MUMBAI |
06-07-2015 |
PURCHASE ORDER FOR SUPPLY OF FABRICATED TECHNOLOGICAL STRUCTURES OF “OVERHEAD TANK FOR SRF & EMERGENCY OVERHEAD TANK” AND FOR COMMON PUMP HOUSE FOR EXTERNAL WATER SYSTEM FOR SMS-III (PKG-077) AT SAIL-BSP BHILAI |
800 MT |
IN PROGRESS |
|
3 |
SAIL – BHILAI STEEL PLANT, BHILAI |
20-06-2015 |
INSTALLATION OF 04NOS. OF 25-TON CNC ROLL TURNING LATHES FOR UNIVERSAL RAIL MILL (PKG142-01); CNC MACHINE SUPPLIED BY M/S HANKOOK MACHINE TOOLS CO LTD, KOREA. |
04 NOS. |
IN PROGRESS |
|
4 |
CHINA FIRST METALLURGICAL CONSTRUCTION INDIA PVT LTD, KOLKATA |
20-01-2015 |
STEAM, COMPRESSED AIR AND INSTRUMENT COMPRESSED AIR OF HEATING POWER PIPE PROJECT; OXYGEN, NITROGEN, ARGON, AND PROPANE OF GAS PIPE PROJECT; HYDRAULIC AND LUBRICATION PIPE, CONDENSED WATER, CLEAN CIRCULATION WATER, SECONDARY COOLING WATER, EMERGENCY WATER, SOFT WATER, DRINKING WATER SUPPLY, PRODUCTION PURIFIER WATER, SEWAGE DRAINAGE PIPE OF SUPPLY AND DRAINAGE PIPE PROJECT, INCLUDING VARIOUS KINDS OF VALVES, FLOW, VORTEX PLATE, MOISTURE TRAP, SPRING HANGERS, GUIDE SUPPORT, SLIDING SUPPORT, U-CLAMP, FIXED SUPPORT, INSULATION, THERMODYNAMIC STEAM TRAP, REDUCER, FLANGE AND BLANK FLANGE, PURGE PIPE, BLEEDER PIPE - ERECTION WORK FOR SECONDARY REFINING UNIT (PKG 025A) OF BHILAI STEEL PLANT. |
650 MT |
IN PROGRESS |
|
5 |
HINDUSTAN STEEL WORKS CONSTRUCTION LIMITED, BHILAI |
08-09-2013 |
RE-BUILDING OF COB-6 TOPR - ERECTION ENABLING WORK (PKG-P1) AT SAIL - BHILAI STEEL PLANT |
450 MT |
COMPLETED |
|
6 |
SAIL – BHILAI STEEL PLANT, BHILAI |
22-02-2013 |
INFRASTRUCTURE FACILITIES FOR 2 X 1250 TPD OXYGEN PLANT - PROVISION OF WATER FACILITIES (WORKS PACKAGE) IN BSP, BHILAI - ERECTION OF MECHANICAL PLANT & EQUIPMENT AND CIVIL WORK |
4000 RM |
COMPLETED |
|
7 |
MACO CORPORATION INDIA PVT LTD, KOLKATA |
02-06-2012 |
FABRICATION & ERECTION OF TECHNOLOGICAL STRUCTURE, COLUMN, TRUSS IN TRANSFER TELPHER AND DELIVERY TELPHER AREA AND ERECTION OF PLANT & EQUIPMENT TELPHERS, RAIL WEDLING PLANT EQUIPMENT WITH CONNECTED PIPELINE IN RWL-URM AT SAIL - BHILAI STEEL PLANT BHILAI |
3000 MT |
COMPLETED |
|
8 |
AIR LIQUIDE GLOBAL E&C SOLUTIONS INDIA PRIVATE LIMITED, NEW DELHI |
17-08-2010 |
ERECTION, TESTING AND COMMISSIONING OF 700 TPD OXYGEN PLANT AT BHILAI STEEL PLANT : |
1200 MT |
COMPLETED |
|
PIPING WORK INCLUDING FABRICATION, ERECTION, RADIOGRAPHY AND PRESSURE TESTING OF CS, SS & AL. |
FAB (INCH DIA) |
EREC (INCH MTR) |
|
|||
CARBON STEEL |
36200 |
50368 |
|
|||
STAINLESS STEEL |
18000 |
24000 |
|
|||
ALUMINUM |
800 |
1720 |
|
|||
STRUCTURAL WORK INCLUDING FABRICATION & ERECTION OF COLD BOX STRUCTURES, LIFT STRUCTURES, PLATFORMS, LADDERS, PIPE RACKS AND SUPPORTS ETC |
700 MT |
|
||||
SS FABRICATION & ERECTION WORK |
|
|||||
9 |
SAIL – BHILAI STEEL PLANT, BHILAI |
30-07-2010 |
INSTALLATION OF ONLINE EDDY CURRENT TESTING MACHINE AND OPTICAL VISUAL INSPECTION SYSTEM SUPPLIED BY M/S NDT TECHNOLOGIES, CANADA AT RAIL MILL INCLUDING FOUNDATION DESING AND CIVIL WORK |
01 NO. |
COMPLETED |
|
10 |
SAIL – BHILAI STEEL PLANT, BHILAI |
05-06-2010 |
NEW COLD SINTER SCREENING SYSTEM UNDER MODERNISATION OF SINTER PLANT-II OF BHILAI STEEL PLANT (PKG-021A) - CIVIL WORK, BUILDING STRUCTURAL WORK, TECHNOLOGICAL STRUCTURAL WORK AND ERECTION OF PLANT & EQUIPMENT AND UTILITIES ETC. |
1500 MT |
COMPLETED |
|
11 |
EMPIRE INDUSTRIAL EQUIPMENT, MUMBAI |
20-05-2010 |
INSTALLATION OF GUILLOTINE SHEAR (PKG-7) AT BHILAI STEEL PLANT - ERECTION OF MECHANICAL PLANT & EQUIPMENT, CIVIL WORK, ELECTRICAL WORK, PIPELINE WORK ETC |
615 MT |
COMPLETED |
|
12 |
GOYAL MG GASES PVT. LTD., NEW DELHI |
05-01-2010 |
ERECTION, TESTING & COMMISSIONING OF 350 TPD OXYGEN PLANT AT BHILAI STEEL PLANT - FABRICATION & ERECTION OF STRUCTURAL WORK, PIPELINE WORK (CS, SS & AL) AND INSTALLATION OF MECHANICAL EQUIPMENT ETC. |
800 MT |
COMPLETED |
|
13 |
DANIELI & C, ITALY |
21-12-2009 |
MANUFACTURING & SUPPLY OF DISC ROLLS, FLANGES, SUPPORTS FOR SLAB CASTER NO-6 AT SAIL - BHILAI STEEL PLANT, BHILAI |
16 NOS. |
COMPLETED |
|
14 |
SAIL – BHILAI STEEL PLANT, BHILAI |
13-10-2009 |
RELOCATION OF MECHANICAL REPAIR SHOP & QUENCHING CAR REPAIR SHOP OF CO&CCD INCLUDING FOUNDATION DESIGN AND CIVIL WORK AND ERECTION OF PLANT & EQUIPMENT. |
700 MT |
COMLETED |
|
15 |
MACO CORPORATION INDIA PVT LTD, KOLKATA |
22-07-2009 |
INSTALLATION OF CNC ROLL GRINDING MACHINE IN PLATE MILL AT SAIL - BHILAI STEEL PLANT BHILAI. |
02 NOS. |
COMPLETED |
|
16 |
BOC INDIA LIMITED, KOLKATA |
21-05-2009 |
ERECTION, TESTING AND COMMISSIONING OF COMPRESSED AIR STATION-4 AT BHILAI STEEL PLANT: 09 NOS. CENTRIFUGAL AIR COMPRESSOR CAPACITY 30000 NM3 AND PUMP HOUSE INCLUDING STRUCTURAL AND PIPING WORK |
1350 MT |
COMPLETED |
|
17 |
SAIL – BHILAI STEEL PLANT, BHILAI |
15-10-2008 |
UPGRADATION OF NITROGEN NETWORK (PHASE-II) OF BHILAI STEEL PLANT - DESIGN & ENGINEERING WORK, CIVIL WORK, STRUCTURAL WORK, SUPPLY OF PLANT & EQUIPMENT AND UTILITIES, ERECTION AND COMMISSIONING ON TURNKEY BASIS |
900 MT
|
COMPLETED |
|
18 |
MACO CORPORATION INDIA PVT LTD, KOLKATA |
04-10-2008 |
PRE & POST SHUTDOWN WORK ON ROUGHING AND FINISHING STAND AT PLATE MILL SAIL - BHILAI STEEL PLANT BHILAI |
15 DAYS |
COMPLETED |
|
19 |
HANKOOK MACHINE TOOLS CO LTD, KOREA |
18-02-2008 |
INSTALLATION OF 02 NOS. OF 05-TON CNC LATHE MACHINES AT BHILAI STEEL PLANT - DESIGN & ENGINEERING OF CIVIL WORK, ERECTION OF MECHANICAL PLANT & EQUIPMENT ETC. |
02 NOS. |
COMPLETED |
|
20 |
TECPRO SYSTEM LIMITED, CHENNAI |
25-09-2007 |
REVAMPING OF STREAM-1 OF COKE SORTING PLANT-2 OF COKE OVEN AND COAL CHEMICAL DEPARTMENT AT BHILAI STEEL PLANT - DISMANTLING, FABRICATION, ERECTION AND MODIFICATION OF STRUCTURES AND BREAKING OF CONCRETE AND CIVIL WORK. |
700 MT |
COMPLETED |
|
21 |
BHILAI ENGINEERING CORPORATION LIMITED, BHILAI |
08-11-2006 |
FABRICATION OF STRUCTURALS, MODIFICATION OF STRUCTURALS, ERECTION & ALIGNMENT OF AG ELEMENTS & PIPELINE(SS, HYDRAULIC, GREASE) AND DISMANTLING WORK OF GAS CLEANING PLANT OF BLAST FURNACE NO-7 OF BHILAI STEEL PLANT, BHILAI. |
600 MT |
COMPLETED |
|
22 |
BHILAI ENGINEERING CORPORATION LIMITED, BHILAI |
22-07-2006 |
ERECTION OF PIPELINE INCLUDING HYDRAULIC/ LUBRICATION EQUIPMENT ITEMS OF WIRE ROD MILL LAYING, SUPPORTING, CLAMPING, DRILLING AND ALIGNMENT THE OVERHEAD/ UNDERGROUND PIPING INCLUDING PICKLING AND GEARING AND FLUSHING OF HYDRAULIC PIPE OF MODERNISATION OF "B" STRAND OF WIRE ROD MILL (PKG NO.-I) AT BHILAI STEEL PLANT |
1300 RM |
COMPLETED |
|
23 |
BHILAI ENGINEERING CORPORATION LIMITED, BHILAI |
19-05-2006 |
FABRICATION AND ERECTION OF TECHNOLOGICAL STRUCTURES, EQUIPMENT, UTILITY PIPELINE, AG ELEMENTS, NOZZLE PIPE, SS ITEMS, SCRUBBER DEMISTER, GAS DUCT, FLUE GAS DUCT, 'U' SEA, STAIRCASE, GRATTINGS, PLATFORMS AND REFRACTORY WORK OF GAS CLEANING PLANT FOR BLAST FURNACE NO -7 AT BHILAI STEEL PLANT. |
550 MT |
COMPLETED |
|
24 |
INSTRUMENTATION LIMITED, BHILAI |
15-02-2006 |
DISMANTLING OF EXISTING RCC, RAFT, FOUNDATION, COLOUMNS, PLATFORMS ETC NEARBY EXHAUSTER NO-3 AT EXHAUSTER-1 OF BHILAI STEEL PLANT |
PKG |
COMPLETED |
|
25 |
INSTRUMENTATION LIMITED, BHILAI |
15-02-2006 |
DISMANTLING OF EXISTING EXHAUSTER HOUSE, NEAR EXHAUSTER NO-3 ITS LUBRICATION SYSTEM PIPELINES LIKE STEAM LINE, GAS LINE ETC |
PKG |
COMPLETED |
|
26 |
SAIL – BHILAI STEEL PLANT, BHILAI |
10-09-2005 |
REVAMPING AND RESTORATION OF GAS CLEANING PLANT FOR BLAST FURNACE. |
PKG |
COMPLETED |
|
27 |
SAIL – BHILAI STEEL PLANT, BHILAI |
12-08-2005 |
FABRICATION, ERECTION AND TESTING OF CS PIPELINE FOR OXYGEN AT PRESSURE 31 BAR FROM OP-II TO SMS-I. FABRICATION, ERECTION AND TESTING OF OXYGEN PRMS (CS, SS & COPPER PIPING) FOR BF – 2 & 5. |
4000 RM |
COMPLETED |
|
28 |
SAIL – BHILAI STEEL PLANT, BHILAI |
28-05-2005 |
ERECTION, TESTING & COMMISSIONING OF 05 NOS. OXYGEN / NITROGEN TURBO COMPRESSORS OF CAPACITY-12500 NM3 AND PRESSURE 31 BAR, MAKE KAZAN (RUSSIA) WITH CS & SS PIPELINE WORK. |
05 NOS. |
COMPLETED |
|
29 |
HANKOOK MACHINE TOOLS CO LTD, KOREA |
20-02-2005 |
INSTALLATION OF 25-TON CNC LATHE MACHINE IN ROLL TRUNING SHOP AT SAIL - BHILAI STEEL PLANT : DESIGN & ENGINEERING, FOUNDATION DESIGN, CIVIL WORK AND ERECTION OF MECHNICAL PLANT & EQUIPMENT ETC |
01 NO. |
COMPLETED |
|
30 |
GA DANIELI INDIA LIMITED, KOLKATA |
24-01-2005 |
COAL DUST INJECTION UNIT FOR BLAST FURNACE NO - 1&5 AT BHILAI STEEL PLANT - STORAGE, HANDLING, ERECTION OF ALL THE EQUIPMENTS, PIPELINES/ VALVES/ PIPE FITTINGS ETC, BATTERY LIMITES ETC |
150 MT |
COMPLETED |
|
31 |
INSTRUMENTATION LIMITED, BHILAI |
09-09-2004 |
ERECTION & TESTING OF MECHANICAL, ELECTRICAL AND INSTRUMENTATION WORK FOR COAL DUST INJECTION SYSTEM TO BF-2 OF BHILAI STEEL PLANT. |
100 MT |
COMPLETED |
|
32 |
HYDRABAD INDUSTRIES LIMITED, KOLKATA |
06-03-2003 |
ERECTION OF MECHANICAL ITEMS FOR LONG RAIL PROJECT (PKG-II) AT SAIL-BHILAI STEEL PLANT - ERECTION OF RAIL MANIPULATOR, ENTRY GUIDE, HYDRAULIC EQUIPMENT, HORIZONTAL & VERTICAL ROLLER STRAIGHTENER, MOUNTING BRUSH, STRAIGHENING ROLLER DISK, CHANGING RINGS, MOUNTING HOOKS, OIL & GREASE LUBRICATION SYSTEM, VALVES, PUMPS, VENTILATION SYSTEM, FIRE EXTINGUISHER, COMPRESSED WITH AIR DRYING UNIT, BED DRAINAGE WATER PUMPS, BOOSTER PUMPS ETC. |
574 MT |
COMPLETED |
|
33 |
JINDAL STEEL & POWER LIMITED, RAIGARH |
25-10-2002 |
ERECTION & COMMISSION OF EQUIPMENT FOR GAS BOOSTER STATION AND EQUIPMENT IN BLAST FURNACE GAS PIPELINE FROM BF TO ROLLING MILL. |
400 MT |
COMPLETED |
|
34 |
SAIL – BHILAI STEEL PLANT, BHILAI |
15-07-2002 |
UP-GRADATION OF NITROGEN NETWORK PHASE-I DISMANTLING OF EXISTING FACILITY AND ERECTION OF NEW EQUIPMENTS AND PIPELINE WORK. |
800 MT |
COMPLETED |
|
35 |
JINDAL STEEL & POWER LIMITED, RAIGARH |
07-02-2002 |
ERECTION OF EQUIPMENT IN PUMP HOUSE, RMH SYSTEM, CONVEYOR BELTS, GEARBOXES, LADDERS, VIBROFEEDERS, SCREENS, PULLEYS, SOFTENER PLANT, WEIGHING SYSTEM, DRYER, COMPRESSOR PLANT, AIR RECEIVER, ALL MOTORS, ASH HANDLING EQUIPMENT, BAG FILTER, COOLING TOWER ETC, FABRICATION & ERECTION OF STRUCTURES AND PIPE WORK INCLUDING FIRE HYDRANTS, ASH PNEUMATIC CONVEYING SYSTEM. |
600 MT |
COMPLETED |
|
36 |
JINDAL STEEL & POWER LIMITED, RAIGARH |
07-02-2002 |
ERECTION OF BLAST FURNACE SHELL, STOVES, HOT BLAST MAIN, BUSTLE PIPE, FURNACE TOP EQUIPMENT, WATER COOLING SYSTEM, COAL DUST INJECTION SYSTEM (CDI), COAL TAR INJECTION SYSTEM, COKE CHARGING SYSTEM, CONVERSION SYSTEM, SLAG GRANULATION PLANT, GAS LINE & UTILITIES INCLUDING ELECTRICAL, INSTRUMENTATION AND REFRACTORY WORK AND ROLL TABLE, HOT SAW EQUIPMENT, COOLING BED, FINISHING AREA, RE-HEATING FURNACE ETC. |
1800 MT |
COMPLETED |
|
37 |
SIEMENS VAI, NEW DELHI |
14-05-2001 |
FABRICATION AND ERECTION OF BUILDING STEEL STRUCTURE FOR RH-DEGASSER NO. 2 AT BHILAI STEEL PLANT. ERECTION AND COMMISSIONING OF RH-DEGASSER FOR SMS-2 BSP, BHILAI |
1100 MT |
COMPLETED |
|
38 |
JINDAL STEEL & POWER LIMITED, RAIGARH |
11-08-2001 |
ERECTION OF WATER PIPELINE SYSTEM OF 351 CUM MINI BLAST FURNACE PROJECT AT JSPL RAIGARH - FABRICATION OF FITTINGS, SLURRY LAUNDER, BENDS, REDUCERS, ELBOWS, PIPE SUPPORTS, SADDLES AND PIPE NIPPLE AND ERECTION WITH ALIGNMENT OF ALL PIPES, MS PIPES, GI PIPES, FITTINGS, HYDRANTS, SS HOSE, SLURRY LAUNDER, BENDS ETC, FABRICATION OF WATER DISTRIBUTION MANIFOLDS AND WATER COLLECTION FUNNELS |
400 MT
|
COMPLETED |
|
39 |
MCNALLY BHARAT ENGG.CO.LTD |
06-01-2001 |
UNLOADING, STACKING, SHIFTING FOR ASSEMBLY, GROUND ASSEMBLY, ERECTION AND BUCKET WHEEL RE-CLAIMER FOR BSP, BHILAI |
315 MT |
COMPLETED |
|
40 |
JINDAL STEEL & POWER LIMITED, RAIGARH |
03-11-2000 |
FABRICATION, ERECTION, TESTING & COMMISSIONING OF INTER PLANT & IN SHOP STEAM PIPELINE. |
1200 RM |
COMPLETED |
|
41 |
SIMPLEX ENGINEERING & FOUNDRY WORKS LTD, BHILAI |
05-05-2000 |
ERECTION, TESTING AND COMMISSIONING OF COMPRESSOR WITH DRYER, RECEIVER, CONNECTED PIPELINES, CIVIL WORK FOR DEDUSTING PIPELINE AREA AND FIRE HYDRANT WORK IN UNDERGROUND PIPELINE WORK AT SINTER PLANT-3-1 AREA OF BHILAI STEEL PLANT |
700 MT |
COMPLETED |
|
42 |
ABB LIMITED |
17-02-2000 |
BAG FILTER UNIT (BF) :- ERECTION, TESTING & COMMISSIONING OF DE-DUSTING SYSTEM CONSISTS OF SUPER STRUCTURES, TECHNOLOGICAL STRUCTURES, BAG FILTERS, 3 NOS OF ID FANS WITH MOTORS, EXPANSION JOINTS AND AIR COMPRESSOR UNITS, CONNECTED PIPE LINES AND DUCTINGS. POST COMMISSIONING & ANNUAL MAINTENANCE CONTRACT FOR ID FAN & BAG FILTER CARRIED OUT BY OUR PEOPLE |
PKG. |
COMPLETED |
|
43 |
SIMPLEX ENGINEERING & FOUNDRY WORKS LTD, BHILAI |
26-07-1999 |
ERECTION OF WIND MAIN AND ALLIED EQUIPMENT IN SINTER MACHINE BUILDING AT SP-3-1 AREA OF BHILAI STEEL PLANT, BHILAI |
1400 MT |
COMPLETED |
|
44 |
BOC INDIA LIMITED, KOLKATA |
05-03-1999 |
ERECTION, TESTING & COMMISSIONING OF 550 TPD OXYGEN PLANT AT BHILAI STEEL PLANT :
|
650 MT |
COMPLETED |
|
45 |
BOC INDIA LIMITED |
05-03-1999 |
FABRICATION, ERECTION, WELDING, TESTING & COMMISSIONING OF WATER PIPEWORK (CS) INCLUDING ITS PAINTING RELATED TO ATC. |
800 RM |
COMPLETED |
|
46 |
SPECS (SIL) |
24-02-1999 |
FABRICATION, ERECTION, TESTING & COMMISSIONING OF SULPHURIC ACID PLANT WHICH INCLUDES STATIC EQUIPMENTS LIKE MIST ELIMINATORS, PLATE HEAT EXCHANGERS, EXPANSION BELLOWS, LOOSE CASTINGS ETC., ROTARY EQUIPMENTS LIKE ID FAN, PUMPS, BLOWERS, BUTTERFLY VALVES ETC. FABRICATION & ERECTION OF DUCTINGS, PIPES, IBR PIPE LINES, ACID, AIR AND WATER PIPE LINE. THE ABOVE PROJECT WAS SUCCESSFULLY COMMISSIONED 23 DAYS AHEAD OF SCHEDULE WHICH IS A STANDING RECORD AS ON DATE IN BHILAI STEEL PLANT. |
800 MT |
COMPLETED |
|
47 |
MODERN INDIA CONSTRUCTION COMPANY |
28-10-1998 |
LOI FOR UNLODING, STORAGE, HANDLING, ERECTION, TESTING, TRIAL AND COMMISSIONING OFMECHANICAL EQUIPMENTS FOR THE WORK OF RMS & HS OF SINTERING PLANT NO.3, PKG-2 OF BSP/SAIL. |
PKG. |
COMPLETED |
|
48 |
SIMPLEX ENGINEERING & FOUNDRY WORKS LTD, BHILAI |
19-09-1998 |
UNDERGROUND PIPELINE WORKS FOR SP-3-1 BHILAI STEEL PLANT, BHILAI |
PKG. |
COMPLETED |
|
49 |
BHILAI STEEL PLANT |
05-09-1998 |
TRANSPORTATION, ERECTION, TESTING, COMMISSIONING AND INSULATION OF TECHNOLOGICAL PIPE LINES AND VENTILATION DUCTING OF FURNACE CROWN COOLING SYSTEM IN THF-1 |
PKG. |
COMPLETED |
|
50 |
BHILAI ENGINEERING CORPORATION LIMITED, BHILAI |
07-02-1998 |
COKE OVEN EQUIPMENT : ERECTION OF COKE OVEN EQUIPMENTS FOR KMCL, DUBARI INCLUDING ELECTRICAL
WIRE ROD MILL, BSP, BHILAI : FABRICATION AND ERECTION OF HYDRAULIC, LUBRICATION EQUIPMENTS WITH FITTINGS AND UTILITY PIPELINE SYSTEM OF SS, CS FOR THE MEDIUM OF OIL, GREASE, STEAM, WATER AND AIR. TESTING COMMISSIONING OF MODERNIZATION OF ‘B’ STRAND OF WIRE ROD MILL . |
2200 MT
1200 RM |
COMPLETED |
|
51 |
MYSORE KIRLOSKER LIMITED |
05-02-1998 |
GAS CLEANING PLANT AND SLURRY DISPOSAL SYSTEM FOR SMS-1, BHILAI STEEL PLANT :
|
600 MT
|
COMPLETED |
|
52 |
BOC INDIA LIMITED |
10-06-1997 |
FABRICATION, ERECTION & PAINTING OF STRUCTURAL WORK FOR PIPE SUPPORTS AND PIPE LINE FROM 25MM DIA TO 200MM DIA |
145 MT |
COMPLETED |
|
53 |
BOC INDIA LIMITED |
26-12-1996 |
ERECTION OF STATIC EQUIPMENT & PRE FABRICATED PIPEWORK, ERECTION OF ROTATING EQUIPMENT AND FABRICATION , WELDING , ERECTION TESTING COMMISSIONING PAINTING OF CS PIPE WORK AND CS PLATES INCLUDING ROLLING AND ALL STRUCTUREALS WORK ARISHING OF PLATFORMMS ,SUPPORTS AND COOLING BUNDLES TROLLEY |
253 MT |
COMPLETED |
|
54 |
OTTO INDIA LIMITED, ORISSA |
21-11-1996 |
ERECTION OF PLANT & EQUIPMENT, VALVES, PUMPS, STAINLESS STEEL, AP LID, ASSEMBLY, FABRICATION & ERECTION OF SUPPORTING STRUCTURES FOR HPALA SYSTEM FOR COB-10 AT BHILAI STEEL PLANT\ |
PKG |
COMPLETED |
|
55 |
BHILAI STEEL PLANT |
18-07-1996 |
EXECUTING THE JOB OF STARTING UP OF ROD SCREEN LOCATION AT SP-2 BSP, BHILAI AND ITS OPERATION & MAINTENANCE. |
400 MT |
COMPLETED |
|
56 |
BHILAI STEEL PLANT |
30-03-1996 |
ERECTON, TESTING, PAINTING & COMMISSIONING OF EXHAUSTER ALONG WITH ITS AUXILIARIES AND PIPE LINE IN COKE OVEN BATTERY -10 COMPLEX BSP |
400 MT |
COMPLETED |