1

AIREFF DETOX PRIVATE LIMITED, MUMBAI

28-07-2015

WORK ORDER FOR ERECTION OF FABRICATED TECHNOLOGICAL STRUCTURES OF “OVERHEAD TANK FOR SRF & EMERGENCY OVERHEAD TANK” AND FOR COMMON PUMP HOUSE FOR EXTERNAL WATER SYSTEM FOR SMS-III (PKG-077) AT SAIL-BSP BHILAI

800 MT

IN PROGRESS

2

AIREFF DETOX PRIVATE LIMITED, MUMBAI

06-07-2015

PURCHASE ORDER FOR SUPPLY OF FABRICATED TECHNOLOGICAL STRUCTURES OF “OVERHEAD TANK FOR SRF & EMERGENCY OVERHEAD TANK” AND FOR COMMON PUMP HOUSE FOR EXTERNAL WATER SYSTEM FOR SMS-III (PKG-077) AT SAIL-BSP BHILAI

800 MT

IN PROGRESS

3

SAIL – BHILAI STEEL PLANT, BHILAI

20-06-2015

INSTALLATION OF 04NOS. OF 25-TON CNC ROLL TURNING LATHES FOR UNIVERSAL RAIL MILL (PKG142-01); CNC MACHINE SUPPLIED BY M/S HANKOOK MACHINE TOOLS CO LTD, KOREA.

04 NOS.

IN PROGRESS

4

CHINA FIRST METALLURGICAL CONSTRUCTION INDIA PVT LTD, KOLKATA

20-01-2015

STEAM, COMPRESSED AIR AND INSTRUMENT COMPRESSED AIR OF HEATING POWER PIPE PROJECT; OXYGEN, NITROGEN, ARGON, AND PROPANE OF GAS PIPE PROJECT; HYDRAULIC AND LUBRICATION PIPE, CONDENSED WATER, CLEAN CIRCULATION WATER, SECONDARY COOLING WATER, EMERGENCY WATER, SOFT WATER, DRINKING WATER SUPPLY, PRODUCTION PURIFIER WATER, SEWAGE DRAINAGE PIPE OF SUPPLY AND DRAINAGE PIPE PROJECT, INCLUDING VARIOUS KINDS OF VALVES, FLOW, VORTEX PLATE, MOISTURE TRAP, SPRING HANGERS, GUIDE SUPPORT, SLIDING SUPPORT, U-CLAMP, FIXED SUPPORT, INSULATION, THERMODYNAMIC STEAM TRAP, REDUCER, FLANGE AND BLANK FLANGE, PURGE PIPE, BLEEDER PIPE - ERECTION WORK FOR SECONDARY REFINING UNIT (PKG 025A) OF BHILAI STEEL PLANT.

650 MT

IN PROGRESS

5

HINDUSTAN STEEL WORKS CONSTRUCTION LIMITED, BHILAI

08-09-2013

RE-BUILDING OF COB-6 TOPR - ERECTION ENABLING WORK (PKG-P1) AT SAIL - BHILAI STEEL PLANT

450 MT

COMPLETED

6

SAIL – BHILAI STEEL PLANT, BHILAI

22-02-2013

INFRASTRUCTURE FACILITIES FOR 2 X 1250 TPD OXYGEN PLANT - PROVISION OF WATER FACILITIES (WORKS PACKAGE) IN BSP, BHILAI - ERECTION OF MECHANICAL PLANT & EQUIPMENT AND CIVIL WORK

4000 RM

COMPLETED

7

MACO CORPORATION INDIA PVT LTD, KOLKATA

02-06-2012

FABRICATION & ERECTION OF TECHNOLOGICAL STRUCTURE, COLUMN, TRUSS IN TRANSFER TELPHER AND DELIVERY TELPHER AREA AND ERECTION OF PLANT & EQUIPMENT TELPHERS, RAIL WEDLING PLANT EQUIPMENT WITH CONNECTED PIPELINE IN RWL-URM AT SAIL - BHILAI STEEL PLANT BHILAI

3000 MT

COMPLETED

8

AIR LIQUIDE GLOBAL E&C SOLUTIONS INDIA PRIVATE LIMITED, NEW DELHI

17-08-2010

ERECTION, TESTING AND COMMISSIONING OF 700 TPD OXYGEN PLANT AT BHILAI STEEL PLANT :
ALL MECHANICAL EQUIPMENTS E.G. COLD BOX COLUMNS, COMPRESSORS, MAIN EXCHANGER, ABSORBER, TURBINE BOOSTER AIR COOLER-1&2, REGENERATION HEATER, AIR WATER EXCHANGER, WATER WASH TOWER, WATER CHILLER TOWER, ATMOSPHERIC VAPORIZER, LIN & LAR TANK, CHILLED WATER PUMPS ETC. 1200 MT.



1200 MT

COMPLETED

PIPING WORK INCLUDING FABRICATION, ERECTION, RADIOGRAPHY AND PRESSURE TESTING OF CS, SS & AL.

FAB

(INCH DIA)

EREC (INCH MTR)

 

CARBON STEEL

36200

50368

 

STAINLESS STEEL

18000

24000

 

ALUMINUM

800

1720

 

STRUCTURAL WORK INCLUDING FABRICATION & ERECTION OF COLD BOX STRUCTURES, LIFT STRUCTURES, PLATFORMS, LADDERS, PIPE RACKS AND SUPPORTS ETC

700 MT

 

SS FABRICATION & ERECTION WORK

 

 

9

SAIL – BHILAI STEEL PLANT, BHILAI

30-07-2010

INSTALLATION OF ONLINE EDDY CURRENT TESTING MACHINE AND OPTICAL VISUAL INSPECTION SYSTEM SUPPLIED BY M/S NDT TECHNOLOGIES, CANADA AT RAIL MILL INCLUDING FOUNDATION DESING AND CIVIL WORK

01 NO.

COMPLETED

10

SAIL – BHILAI STEEL PLANT, BHILAI

05-06-2010

NEW COLD SINTER SCREENING SYSTEM UNDER MODERNISATION OF SINTER PLANT-II OF BHILAI STEEL PLANT (PKG-021A) - CIVIL WORK, BUILDING STRUCTURAL WORK, TECHNOLOGICAL STRUCTURAL WORK AND ERECTION OF PLANT & EQUIPMENT AND UTILITIES ETC.

1500 MT

COMPLETED

11

EMPIRE INDUSTRIAL EQUIPMENT, MUMBAI

20-05-2010

INSTALLATION OF GUILLOTINE SHEAR (PKG-7) AT BHILAI STEEL PLANT - ERECTION OF MECHANICAL PLANT  & EQUIPMENT, CIVIL WORK, ELECTRICAL WORK, PIPELINE WORK ETC

615 MT

COMPLETED

12

GOYAL MG GASES PVT. LTD., NEW DELHI

05-01-2010

ERECTION, TESTING & COMMISSIONING OF 350 TPD OXYGEN PLANT AT BHILAI STEEL PLANT - FABRICATION & ERECTION OF STRUCTURAL WORK, PIPELINE WORK (CS, SS & AL) AND INSTALLATION OF MECHANICAL EQUIPMENT ETC.

800 MT

COMPLETED

13

DANIELI & C, ITALY

21-12-2009

MANUFACTURING & SUPPLY OF DISC ROLLS, FLANGES, SUPPORTS FOR SLAB CASTER NO-6 AT SAIL - BHILAI STEEL PLANT, BHILAI

16 NOS.

COMPLETED

14

SAIL – BHILAI STEEL PLANT, BHILAI

13-10-2009

RELOCATION OF MECHANICAL REPAIR SHOP & QUENCHING CAR REPAIR SHOP OF CO&CCD INCLUDING FOUNDATION DESIGN AND CIVIL WORK AND ERECTION OF PLANT & EQUIPMENT.

700 MT

COMLETED

15

MACO CORPORATION INDIA PVT LTD, KOLKATA

22-07-2009

INSTALLATION OF CNC ROLL GRINDING MACHINE IN PLATE MILL AT SAIL - BHILAI STEEL PLANT BHILAI.

02 NOS.

COMPLETED

16

BOC INDIA LIMITED, KOLKATA

21-05-2009

ERECTION, TESTING AND COMMISSIONING OF COMPRESSED AIR STATION-4 AT BHILAI STEEL PLANT: 09 NOS. CENTRIFUGAL AIR COMPRESSOR CAPACITY 30000 NM3 AND PUMP HOUSE  INCLUDING STRUCTURAL AND PIPING WORK

1350 MT

COMPLETED

17

SAIL – BHILAI STEEL PLANT, BHILAI

15-10-2008

UPGRADATION OF NITROGEN NETWORK (PHASE-II) OF BHILAI STEEL PLANT - DESIGN & ENGINEERING WORK, CIVIL WORK, STRUCTURAL WORK, SUPPLY OF PLANT & EQUIPMENT AND UTILITIES, ERECTION AND COMMISSIONING ON TURNKEY BASIS

900 MT

 

COMPLETED

18

MACO CORPORATION INDIA PVT LTD, KOLKATA

04-10-2008

PRE & POST SHUTDOWN WORK ON ROUGHING AND FINISHING STAND AT PLATE MILL SAIL - BHILAI STEEL PLANT BHILAI

15 DAYS

COMPLETED

19

HANKOOK MACHINE TOOLS CO LTD, KOREA

18-02-2008

INSTALLATION OF 02 NOS. OF 05-TON CNC LATHE MACHINES AT BHILAI STEEL PLANT - DESIGN & ENGINEERING OF CIVIL WORK, ERECTION OF MECHANICAL PLANT & EQUIPMENT ETC.

02 NOS.

COMPLETED

20

TECPRO SYSTEM LIMITED, CHENNAI

25-09-2007

REVAMPING OF STREAM-1 OF COKE SORTING PLANT-2 OF COKE OVEN AND COAL CHEMICAL DEPARTMENT AT BHILAI STEEL PLANT - DISMANTLING, FABRICATION, ERECTION AND MODIFICATION OF STRUCTURES AND BREAKING OF CONCRETE AND CIVIL WORK.

700 MT

COMPLETED

21

BHILAI ENGINEERING CORPORATION LIMITED, BHILAI

08-11-2006

FABRICATION OF STRUCTURALS, MODIFICATION OF STRUCTURALS, ERECTION & ALIGNMENT OF AG ELEMENTS & PIPELINE(SS, HYDRAULIC, GREASE) AND DISMANTLING WORK OF GAS CLEANING PLANT OF BLAST FURNACE NO-7 OF BHILAI STEEL PLANT, BHILAI.

600 MT

COMPLETED

22

BHILAI ENGINEERING CORPORATION LIMITED, BHILAI

22-07-2006

ERECTION OF PIPELINE INCLUDING HYDRAULIC/ LUBRICATION EQUIPMENT ITEMS OF WIRE ROD MILL LAYING, SUPPORTING, CLAMPING, DRILLING AND ALIGNMENT THE OVERHEAD/ UNDERGROUND PIPING INCLUDING PICKLING AND GEARING AND FLUSHING OF HYDRAULIC PIPE OF MODERNISATION OF "B" STRAND OF WIRE ROD MILL (PKG NO.-I) AT BHILAI STEEL PLANT

1300 RM

COMPLETED

23

BHILAI ENGINEERING CORPORATION LIMITED, BHILAI

19-05-2006

FABRICATION AND ERECTION OF TECHNOLOGICAL STRUCTURES, EQUIPMENT, UTILITY PIPELINE, AG ELEMENTS, NOZZLE PIPE, SS ITEMS, SCRUBBER DEMISTER, GAS DUCT, FLUE GAS DUCT, 'U' SEA, STAIRCASE, GRATTINGS, PLATFORMS AND REFRACTORY WORK OF GAS CLEANING PLANT FOR BLAST FURNACE NO -7 AT BHILAI STEEL PLANT.

550 MT

COMPLETED

24

INSTRUMENTATION LIMITED, BHILAI

15-02-2006

DISMANTLING OF EXISTING RCC, RAFT, FOUNDATION, COLOUMNS, PLATFORMS ETC NEARBY EXHAUSTER NO-3 AT EXHAUSTER-1 OF BHILAI STEEL PLANT

PKG

COMPLETED

25

INSTRUMENTATION LIMITED, BHILAI

15-02-2006

DISMANTLING OF EXISTING EXHAUSTER HOUSE, NEAR EXHAUSTER NO-3 ITS LUBRICATION SYSTEM PIPELINES LIKE STEAM LINE, GAS LINE ETC

PKG

COMPLETED

26

SAIL – BHILAI STEEL PLANT, BHILAI

10-09-2005

REVAMPING AND RESTORATION OF GAS CLEANING PLANT FOR BLAST FURNACE.

PKG

COMPLETED

27

SAIL – BHILAI STEEL PLANT, BHILAI

12-08-2005

FABRICATION, ERECTION AND TESTING OF CS PIPELINE FOR OXYGEN AT PRESSURE 31 BAR FROM OP-II TO SMS-I. FABRICATION, ERECTION AND TESTING OF OXYGEN PRMS (CS, SS & COPPER PIPING) FOR BF – 2 & 5.

4000 RM

COMPLETED

28

SAIL – BHILAI STEEL PLANT, BHILAI

28-05-2005

ERECTION, TESTING & COMMISSIONING OF  05 NOS. OXYGEN / NITROGEN TURBO COMPRESSORS OF CAPACITY-12500 NM3 AND PRESSURE 31 BAR, MAKE KAZAN (RUSSIA) WITH CS & SS PIPELINE WORK.

05 NOS.

COMPLETED

29

HANKOOK MACHINE TOOLS CO LTD, KOREA

20-02-2005

INSTALLATION OF 25-TON CNC LATHE MACHINE IN ROLL TRUNING SHOP AT SAIL - BHILAI STEEL PLANT : DESIGN & ENGINEERING, FOUNDATION DESIGN, CIVIL WORK AND ERECTION OF MECHNICAL PLANT & EQUIPMENT ETC

01 NO.

COMPLETED

30

GA DANIELI INDIA LIMITED, KOLKATA

24-01-2005

COAL DUST INJECTION UNIT FOR BLAST FURNACE NO - 1&5 AT BHILAI STEEL PLANT - STORAGE, HANDLING, ERECTION OF ALL THE EQUIPMENTS, PIPELINES/ VALVES/ PIPE FITTINGS ETC, BATTERY LIMITES ETC

150 MT

COMPLETED

31

INSTRUMENTATION LIMITED, BHILAI

09-09-2004

ERECTION & TESTING OF MECHANICAL, ELECTRICAL AND INSTRUMENTATION WORK FOR COAL DUST INJECTION SYSTEM TO BF-2 OF BHILAI STEEL PLANT.

100 MT

COMPLETED

32

HYDRABAD INDUSTRIES LIMITED, KOLKATA

06-03-2003

ERECTION OF MECHANICAL ITEMS FOR LONG RAIL PROJECT (PKG-II) AT SAIL-BHILAI STEEL PLANT - ERECTION OF RAIL MANIPULATOR, ENTRY GUIDE, HYDRAULIC EQUIPMENT, HORIZONTAL & VERTICAL ROLLER STRAIGHTENER, MOUNTING BRUSH, STRAIGHENING ROLLER DISK, CHANGING RINGS, MOUNTING HOOKS, OIL & GREASE LUBRICATION SYSTEM, VALVES, PUMPS, VENTILATION SYSTEM, FIRE EXTINGUISHER, COMPRESSED WITH AIR DRYING UNIT, BED DRAINAGE WATER PUMPS, BOOSTER PUMPS ETC.

574 MT

COMPLETED

33

JINDAL STEEL & POWER LIMITED, RAIGARH

25-10-2002

ERECTION & COMMISSION OF EQUIPMENT FOR GAS BOOSTER STATION AND EQUIPMENT IN BLAST FURNACE GAS PIPELINE FROM BF TO ROLLING MILL.

400 MT

COMPLETED

34

SAIL – BHILAI STEEL PLANT, BHILAI

15-07-2002

UP-GRADATION OF NITROGEN NETWORK PHASE-I DISMANTLING OF EXISTING FACILITY AND ERECTION OF NEW EQUIPMENTS AND PIPELINE WORK.

800 MT

COMPLETED

35

JINDAL STEEL & POWER LIMITED, RAIGARH

07-02-2002

ERECTION OF EQUIPMENT IN PUMP HOUSE, RMH SYSTEM, CONVEYOR BELTS, GEARBOXES, LADDERS, VIBROFEEDERS, SCREENS, PULLEYS, SOFTENER PLANT, WEIGHING SYSTEM, DRYER, COMPRESSOR PLANT, AIR RECEIVER, ALL MOTORS, ASH HANDLING EQUIPMENT, BAG FILTER, COOLING TOWER ETC, FABRICATION & ERECTION OF STRUCTURES AND PIPE WORK INCLUDING FIRE HYDRANTS, ASH PNEUMATIC CONVEYING SYSTEM.

600 MT

COMPLETED

36

JINDAL STEEL & POWER LIMITED, RAIGARH

07-02-2002

ERECTION OF BLAST FURNACE SHELL, STOVES, HOT BLAST MAIN, BUSTLE PIPE, FURNACE TOP EQUIPMENT, WATER COOLING SYSTEM, COAL DUST INJECTION SYSTEM (CDI), COAL TAR INJECTION SYSTEM, COKE CHARGING SYSTEM, CONVERSION SYSTEM, SLAG GRANULATION PLANT, GAS LINE & UTILITIES INCLUDING ELECTRICAL, INSTRUMENTATION AND REFRACTORY WORK AND ROLL TABLE, HOT SAW EQUIPMENT, COOLING BED, FINISHING AREA, RE-HEATING FURNACE ETC.

1800 MT

COMPLETED

37

SIEMENS VAI, NEW DELHI

14-05-2001

FABRICATION AND ERECTION OF BUILDING STEEL STRUCTURE FOR RH-DEGASSER NO. 2 AT BHILAI STEEL PLANT. ERECTION AND COMMISSIONING OF RH-DEGASSER FOR SMS-2 BSP, BHILAI

1100 MT

COMPLETED

38

JINDAL STEEL & POWER LIMITED, RAIGARH

11-08-2001

ERECTION OF WATER PIPELINE SYSTEM OF 351 CUM MINI BLAST FURNACE PROJECT AT JSPL RAIGARH - FABRICATION OF FITTINGS, SLURRY LAUNDER, BENDS, REDUCERS, ELBOWS, PIPE SUPPORTS, SADDLES AND PIPE NIPPLE AND ERECTION WITH ALIGNMENT OF ALL PIPES, MS PIPES, GI PIPES, FITTINGS, HYDRANTS, SS HOSE, SLURRY LAUNDER, BENDS ETC, FABRICATION OF WATER DISTRIBUTION MANIFOLDS AND WATER COLLECTION FUNNELS

400 MT

 

COMPLETED

39

MCNALLY BHARAT ENGG.CO.LTD

06-01-2001

UNLOADING, STACKING, SHIFTING FOR ASSEMBLY, GROUND ASSEMBLY, ERECTION AND BUCKET WHEEL RE-CLAIMER FOR BSP, BHILAI

315 MT

COMPLETED

40

JINDAL STEEL & POWER LIMITED, RAIGARH

03-11-2000

FABRICATION, ERECTION, TESTING & COMMISSIONING OF INTER PLANT & IN SHOP STEAM PIPELINE.

1200 RM

COMPLETED

41

SIMPLEX ENGINEERING & FOUNDRY WORKS LTD, BHILAI

05-05-2000

ERECTION, TESTING AND COMMISSIONING OF COMPRESSOR WITH DRYER, RECEIVER, CONNECTED PIPELINES, CIVIL WORK FOR DEDUSTING PIPELINE AREA AND FIRE HYDRANT WORK IN UNDERGROUND PIPELINE WORK AT SINTER PLANT-3-1 AREA OF BHILAI STEEL PLANT

700 MT

COMPLETED

42

ABB LIMITED

17-02-2000

BAG FILTER UNIT (BF) :- ERECTION, TESTING & COMMISSIONING OF DE-DUSTING SYSTEM CONSISTS OF SUPER STRUCTURES, TECHNOLOGICAL STRUCTURES, BAG FILTERS, 3 NOS OF ID FANS WITH MOTORS, EXPANSION JOINTS AND AIR COMPRESSOR UNITS, CONNECTED PIPE LINES AND DUCTINGS. POST COMMISSIONING & ANNUAL MAINTENANCE CONTRACT FOR ID FAN & BAG FILTER CARRIED OUT BY OUR PEOPLE

PKG.

COMPLETED

43

SIMPLEX ENGINEERING & FOUNDRY WORKS LTD, BHILAI

26-07-1999

ERECTION OF WIND MAIN AND ALLIED EQUIPMENT IN SINTER MACHINE BUILDING AT SP-3-1 AREA OF BHILAI STEEL PLANT, BHILAI

1400 MT

COMPLETED

44

BOC INDIA LIMITED, KOLKATA

05-03-1999

ERECTION, TESTING & COMMISSIONING OF 550 TPD OXYGEN PLANT AT BHILAI STEEL PLANT :
 ALL STRUCTURAL, MECHANICAL AND PIPING WORK (CS, ALUMINIUM & SS) INCLUDING ERECTION OF COMPRESSORS (MAKE DEMAG) AND COLD BOX.


OXYGEN PRMS-IV AT BHILAI STEEL PLANT :
 ALL CS, SS & COPPER PIPING WORK FOR SMS-I.

650 MT

COMPLETED

45

BOC INDIA LIMITED

05-03-1999

FABRICATION, ERECTION, WELDING, TESTING & COMMISSIONING OF WATER PIPEWORK (CS) INCLUDING ITS PAINTING RELATED TO ATC.

800 RM

COMPLETED

46

SPECS (SIL)

24-02-1999

FABRICATION, ERECTION, TESTING & COMMISSIONING OF SULPHURIC ACID PLANT WHICH INCLUDES STATIC EQUIPMENTS LIKE MIST ELIMINATORS, PLATE HEAT EXCHANGERS, EXPANSION BELLOWS, LOOSE CASTINGS ETC., ROTARY EQUIPMENTS LIKE ID FAN, PUMPS, BLOWERS, BUTTERFLY VALVES ETC. FABRICATION & ERECTION OF DUCTINGS, PIPES, IBR PIPE LINES, ACID, AIR AND WATER PIPE LINE.  THE ABOVE PROJECT WAS SUCCESSFULLY COMMISSIONED 23 DAYS AHEAD OF SCHEDULE WHICH IS A STANDING RECORD AS ON DATE IN BHILAI STEEL PLANT.

800 MT

COMPLETED

47

MODERN INDIA CONSTRUCTION COMPANY

28-10-1998

LOI FOR UNLODING, STORAGE, HANDLING, ERECTION, TESTING, TRIAL AND COMMISSIONING OFMECHANICAL EQUIPMENTS FOR THE WORK OF RMS & HS OF SINTERING PLANT NO.3, PKG-2 OF BSP/SAIL.

PKG.

COMPLETED

48

SIMPLEX ENGINEERING & FOUNDRY WORKS LTD, BHILAI

19-09-1998

UNDERGROUND PIPELINE WORKS FOR SP-3-1 BHILAI STEEL PLANT, BHILAI

PKG.

COMPLETED

49

BHILAI STEEL PLANT

05-09-1998

TRANSPORTATION, ERECTION, TESTING, COMMISSIONING AND INSULATION OF TECHNOLOGICAL PIPE LINES AND VENTILATION DUCTING OF FURNACE CROWN COOLING SYSTEM IN THF-1

PKG.

COMPLETED

50

BHILAI ENGINEERING CORPORATION LIMITED, BHILAI

07-02-1998

COKE OVEN EQUIPMENT : ERECTION OF COKE OVEN EQUIPMENTS FOR KMCL, DUBARI INCLUDING ELECTRICAL

 

WIRE ROD MILL, BSP, BHILAI : FABRICATION AND ERECTION OF HYDRAULIC, LUBRICATION EQUIPMENTS WITH FITTINGS AND UTILITY PIPELINE SYSTEM OF SS, CS FOR THE MEDIUM OF OIL, GREASE, STEAM, WATER AND AIR. TESTING COMMISSIONING OF MODERNIZATION OF ‘B’ STRAND OF WIRE ROD MILL .

2200 MT

 

 

 

1200 RM

COMPLETED

51

MYSORE KIRLOSKER LIMITED

05-02-1998

GAS CLEANING PLANT AND SLURRY DISPOSAL SYSTEM FOR SMS-1, BHILAI STEEL PLANT :
FABRICATION AND ERECTION OF TECHNOLOGICAL STRUCTURES, EQUIPMENTS INCLUDING SCRUBBER / DEMISTER, GAS DUCTS, KINPACTOR, ID FAN, STACKER, PUMP HOUSE, EOT CRANE, SLURRY DISPOSAL SYSTEM, COMPLETE ELECTRICAL AND REFRACTORY WORK.



POWER PLANT –I BSP, BHILAI : FABRICATION AND ERECTION OF BAG FILTER, EQUIPMENTS, ID FANS, DUCTS, HOODS, FLANGES, DAMPERS, DUCT ELBOWS, EXPANSION JOINTS, VALVES ETC.


ESP AT SP-II, BSP, BHILAI : FABRICATION AND ERECTION OF ELECTRO STATIC PRECIPITATOR, ID FANS, DUCTS, CONVEYORS, SCREENS, STRUCTURES, PUMP HOUSE , STACKER, STAIR CASES, WALKWAYS, GRATINGS ETC

600 MT

 

 

 

 

 

 

 

 

 

COMPLETED

52

BOC INDIA LIMITED

10-06-1997

FABRICATION, ERECTION & PAINTING OF STRUCTURAL WORK FOR PIPE SUPPORTS AND PIPE LINE FROM 25MM DIA TO 200MM DIA

145 MT

COMPLETED

53

BOC INDIA LIMITED

26-12-1996

ERECTION OF STATIC EQUIPMENT & PRE FABRICATED PIPEWORK, ERECTION OF ROTATING EQUIPMENT AND FABRICATION , WELDING , ERECTION TESTING COMMISSIONING PAINTING OF CS PIPE WORK AND CS PLATES INCLUDING ROLLING AND ALL STRUCTUREALS WORK ARISHING OF PLATFORMMS ,SUPPORTS AND COOLING BUNDLES TROLLEY

253 MT

COMPLETED

54

OTTO INDIA LIMITED, ORISSA

21-11-1996

ERECTION OF PLANT & EQUIPMENT, VALVES, PUMPS, STAINLESS STEEL, AP LID, ASSEMBLY, FABRICATION & ERECTION OF SUPPORTING STRUCTURES FOR HPALA SYSTEM FOR COB-10 AT BHILAI STEEL PLANT\

PKG

COMPLETED

55

BHILAI STEEL PLANT

18-07-1996

EXECUTING THE JOB OF STARTING UP OF ROD SCREEN LOCATION AT SP-2 BSP, BHILAI AND ITS OPERATION & MAINTENANCE.

400 MT

COMPLETED

56

BHILAI STEEL PLANT

30-03-1996

ERECTON, TESTING, PAINTING & COMMISSIONING OF EXHAUSTER ALONG WITH ITS AUXILIARIES AND PIPE LINE  IN COKE OVEN BATTERY -10 COMPLEX BSP

400 MT

COMPLETED